Domain Social Forums

Full Version: Henkel Bode coating of thin plastic coating
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Floor installation in the general order: first install the floor, after the installation of the door. If you need to install the door, to keep the height of the ground in advance, the calculation 3 floor house with roof top desk method is: floor thickness +2.5 mm mat thickness + buckle thickness (depending on the material). When installing the baseboard, pay attention to the mouth flush at the same time, but also pay attention to the gap between the baseboard and the floor should not exceed 1 mm.
If nails are fixed, the distance between nail and nail shall not dark burlwood material exceed 40cm. If the living room is geothermal ground, to open the ground floor heat a few weeks ago, open the window ventilation, moisture distribution.
Damage to the floor can be devastating if the surface temperature of any geothermal floor lasts more than 27 degrees. It is advisable to maintain the floor two days before placing the furniture after installing the floor for the first time. Do not buy low-quality skin care products sold by strangers, so as to avoid unnecessary inexpensive patio furniture cushions economic losses. In the daily use of the floor, indoor temperature should be kept between 18 to 22 degrees Celsius, the best air humidity is between 45% to 65%.